Finally the Hong Kong-Zhuhai-Macao Bridge opened this week. It’s been a long process since we originally started back in 2011, being one of Hong Kong's largest ever infrastructure projects. We have worked with Atkins and China State Construction on the second of three packages for the Hong Kong side of the ‘Bridge’ The Scenic Hill to Cross Boundary Facilities section required significant land reclamation for a new highway, tunnels, linking roads and maintenance facilities at the existing Chep Lap Kok Airport.
Under the ‘design and build’ contract my team have conceived and detailed the significant landscape design elements and interventions on the project, planting a large number of trees and shrubs and most importantly incorporating a low cost, sustainable drainage solution for the majority of landscape areas.
Read more:
2018/10/15 WORKSHOP 1st Working Session with HKIUD 2018/10/10 WORKSHOP Ageing Experience Workshop #2 2018/09/21 CONGRATULATIONS: Barry Wilson Elected HKIUD Vice President 2018/09/25 WORKSHOP Transitional Social Housing Workshop
0 Comments
Leave a Reply. |
ArchivesCategories
All
|