Barry Wilson Project Initiatives
  • HOME
    • dispute resolution
    • concierge services
  • development
    • FUTUREPROOF CITY
    • PUBLICATION
    • ABOUT US >
      • director
      • CONTACT US
      • JOIN US
    • CAPABILITY >
      • benefit
      • philosophy
      • associates
    • BARRY SAYS
    • BARRY SHARES
    • HAPPENINGS
    • PROJECTS >
      • planning
      • environmental
      • public sector
      • corporate
      • residential
  • 中文

Hong Kong-Zhuhai-Macao Bridge Hong Kong Link Road

26/10/2018

0 Comments

 
Picture
Image:China State Construction
Finally the Hong Kong-Zhuhai-Macao Bridge opened this week. It’s been a long process since we originally started back in 2011, being one of Hong Kong's largest ever infrastructure projects. 

We have worked with Atkins and China State Construction on the second of three packages for the Hong Kong side of the ‘Bridge’

The Scenic Hill to Cross Boundary Facilities section required significant land reclamation for a new highway, tunnels, linking roads and maintenance facilities at the existing Chep Lap Kok Airport. 

​Project:

Hong Kong-Zhuhai-Macao Bridge
Hong Kong Link Road – Section between Scenic Hill and Hong Kong Boundary Crossing Facilities.

Location:

Hong Kong

Client: 

Government of HKSAR / China State Construction / Atkins China Ltd

Type:

Landscape design

Size:

23 ha
​2018 completion

​Under the ‘design and build’ contract my team have conceived and detailed the significant landscape design elements and interventions on the project, planting a large number of trees and shrubs and most importantly incorporating a low cost, sustainable drainage solution for the majority of landscape areas.   
Picture
Image:Atkins China

​THE LANDSCAPE PROBLEM

The project area is rather complicated. It generally consists of a large number of fragmented and leftover areas between highway connections, with various requirements of differing land ownership and maintenance parties.
The project area is rather complicated. It generally consists of a large number of fragmented and leftover areas between highway connections, with various requirements of differing land ownership and maintenance parties.
Moreover, extensive underground technical   infrastructure, together with rigid restrictions on use of plant species so   as to avoid risk of bird strike to aircraft, provided significant constraints  on the landscape design opportunities.
New land reclamation areas have been   formed solely for the construction of the spaghetti of new road   infrastructure required to connect the Bridge’s elevated highway into the   ground services.   

Picture
Image:BWPI

​THE LANDSCAPE SOLUTION

​We wanted to develop a design that provides an overall structure to the project site, acting to stitch together all the new and old fragmented land parcels within the transport corridor of the Bridge Link Road. We did this by extending the scale and alignment of the existing airport development grid right across the new reclamation area.
Picture
Image:BWPI

THE LANDSCAPE OBJECTIVES

Picture
Image:BWPI
•Develop a localised and differentiated landscape aesthetics strategy for the project with a strong ‘gateway’ design theme which unifies the development;

•Seamlessly blend the new development within the context of both the existing urbanised airport fabric and the naturalised environment of Scenic Hill; 

•Integrate with the aesthetics of the new Highway Administration Buildings whilst relating to other surrounding buildings;

•Consider and implement international solutions in developing pragmatic, sensitive and sustainable design that achieves the best social, economic and environmental fit;

•Address the difficulties of site location and microclimate;

•Incorporate sustainable water management practices; and

•Minimise long term maintenance implications in addition to reducing capital costs.


Picture
Image: Atkins China
We think we have done a great job.

Thanks to all the team who worked on the project over the years :


Davide MARVARDI

Nevena DILPARIC
​
Eva MA

Vlady IVANETS

Victor ROBERTO

Aleksandra SARGAEVA 
Read more:

2018/10/15
WORKSHOP
1st Working Session with HKIUD
2018/10/10
WORKSHOP
Ageing Experience Workshop #2
2018/09/21
CONGRATULATIONS:
Barry Wilson Elected HKIUD Vice President​
2018/09/25
WORKSHOP
Transitional Social Housing Workshop
Picture
Picture
Picture
0 Comments
    Picture

    Archives

    November 2018
    October 2018

    2018
    2017
    2016
    2015
    2014

    Categories

    All
    Interview
    Project In Focus
    Workshop

    Picture
    Picture
    Picture

    Picture
    Picture
    Wechat

services

development feasibility + design + management
dispute resolution
UK property concierge

enquiries

Hong Kong  +852 2904 9491
Shenzhen    +86 15012512413
London         +44 07244 960145


© COPYRIGHT 2015. ALL RIGHTS RESERVED.
  • HOME
    • dispute resolution
    • concierge services
  • development
    • FUTUREPROOF CITY
    • PUBLICATION
    • ABOUT US >
      • director
      • CONTACT US
      • JOIN US
    • CAPABILITY >
      • benefit
      • philosophy
      • associates
    • BARRY SAYS
    • BARRY SHARES
    • HAPPENINGS
    • PROJECTS >
      • planning
      • environmental
      • public sector
      • corporate
      • residential
  • 中文