Barry Wilson Project Initiatives
  • HOME
    • dispute resolution
    • concierge services
  • development
    • FUTUREPROOF CITY
    • PUBLICATION
    • ABOUT US >
      • director
      • CONTACT US
      • JOIN US
    • CAPABILITY >
      • benefit
      • philosophy
      • associates
    • BARRY SAYS
    • BARRY SHARES
    • HAPPENINGS
    • PROJECTS >
      • planning
      • environmental
      • public sector
      • corporate
      • residential
  • 中文

City Rail Construction Come to Full Stop Due to Subsidences 

14/3/2013

0 Comments

 
Picture
A Big Hole in the Street






back
The 4 subsidences happened along the construction site of Dongguan - Huizhou intercity rail during March 6 to March 11. The biggest one which happened near Changping Avenue, created a big hole of 50 square meters.


300 people were evacuated after the first accident, no casualty is reported.

Preliminary research shows that the main reason for the accidents is that the load bearing rocks above the rail tunnel lost its stability due to pipe leak around them.

At present, the operation has come to full stop and will not restart until safety is secured.



Related Article

0 Comments



Leave a Reply.























    Picture

services

development feasibility + design + management
dispute resolution
UK property concierge

enquiries

Hong Kong  +852 2904 9491
Shenzhen    +86 15012512413
London         +44 07244 960145


© COPYRIGHT 2015. ALL RIGHTS RESERVED.
  • HOME
    • dispute resolution
    • concierge services
  • development
    • FUTUREPROOF CITY
    • PUBLICATION
    • ABOUT US >
      • director
      • CONTACT US
      • JOIN US
    • CAPABILITY >
      • benefit
      • philosophy
      • associates
    • BARRY SAYS
    • BARRY SHARES
    • HAPPENINGS
    • PROJECTS >
      • planning
      • environmental
      • public sector
      • corporate
      • residential
  • 中文